Safer Neighbourhoods Stronger Communities

Gas Network Update – Blairforkie Drive Area = Bridge of Allan

Gas Network Update – Blairforkie Drive Area = Bridge of Allan

This Message is Distributed on Behalf of SGNDear {FIRST_NAME},Works to replace approximately 6500m are still ongoing and are progressing well, our final phase of works are scheduled to commence on the 5 January 2023 for approximately 10 weeks. During this time we will be required to close Blairforkie Drive at the junction of Henderson Street. Temporary signals will be in place during this time, these will cause delays during busy peak periods. Manual control will be in place at this time.Parking suspensions will also be in place throughout works, as our project will be carried out on a phased basis not all streets will be affected at once.Parking restrictions Phase 3: ·       Avenue Park – full street (3104124)·       Inverallan Road 32-20 both sides (3104130)·       Westerlea Drive – full street (3138131)·       14 Henderson Street to Inverallan Road both sides (3104112·       Inverallan Road from Henderson Street – Station Road. Both sides (3104117)·       Station Road between Inverallon Road & Cawder Road·       Blairforkie Drive between Allan Walk and Henderson Street·       Wellgate Drive outside 4 – Beaconcroft junction (3137793)During this project temporary road signals will be in use on Henderson Street, these will cause delays during busy peak periods. Blairforkie Drive will be closed with its junction with Henderson Street. A local diversion route will be in operation during this time.Road/footway closures Phase 3: ·       Blairforkie Drive·       Footway closure between Welgate Drive/Pathfoot Drive We wish to assure you that work will progress as quickly as possible, and we will make every effort to minimise any inconvenience caused by our works.